INGING Consulting Engineers

Services

Flood Modelling

ING Consulting Engineers undertakes flood assessments and modelling to understand existing and future flood behaviour and to support informed development decisions.

What we provide

  • Flood modelling and analysis
  • Existing and post-development flood assessments
  • 1D and 2D flood modelling
  • Flood-depth and flood-velocity assessment
  • Flood-level assessment
  • Overland flow assessment
  • Flood impact assessment
  • Development flood studies
  • Climate-change and sensitivity assessments
  • Emergency flood-management assessment

We use modelling to identify flood constraints, evaluate development impacts and develop practical mitigation measures.

Flood Modelling engineering work

Planning your engineering scope

What does ING assess through flood modelling?

ING assesses existing and post-development flood behaviour using 1D and 2D modelling. The scope can include flood depths, velocities and levels, overland flow, development impacts, and climate-change and sensitivity assessments.

How can flood modelling inform a development?

Modelling helps identify flood constraints, evaluate development impacts and develop mitigation measures. At the Cowper Street residential apartments in Parramatta, flood modelling informed an automated flood gate intended to prevent floodwater entering the basement car park.

Professional engineering services across New South Wales, Queensland, Victoria and Western Australia. Meet our team and view our engineering credentials.

To discuss a scope, share your site address, proposal and any available survey, drawings or council correspondence. You can also contact us before these documents are ready.

Related project examples

Parramatta, NSW

Residential Apartments, Cowper Street

An automated flood gate was used to prevent ingress of flood water from entering the basement car park after flood modelling was completed.

Hurstville, NSW

Capping of Kempt Field

Overland flow and on-site detention modelling for capping of Kempt Field.

Start with a clear understanding of your site.

Whether you are assessing a site, preparing a development application or resolving a stormwater or flood constraint, ING can help define the engineering path forward.

Discuss Your Project