Our Approach
Practical, clear and fit-for-purpose engineering.
At ING Consulting Engineers, we believe good engineering should be practical, clear and fit for purpose.
We work closely with our clients and project teams from the early planning stages through to detailed design and approval. By identifying hydraulic and flood constraints early, we can help minimise redesign, delays and unnecessary construction costs.
Our five-step process
- 01
Understand
- 02
Model
- 03
Assess
- 04
Design
- 05
Resolve
We first understand the site's physical characteristics, planning constraints and project objectives. We then analyse the hydraulic and flood behaviour before developing a solution that addresses both regulatory requirements and practical construction considerations.
Integrated Water Management
Stormwater, water quality and flooding are interconnected.
A development's drainage strategy can influence downstream flooding, water quality, detention requirements and the overall performance of the site. ING Consulting Engineers therefore takes an integrated approach to water management, considering:
- Site drainage
- Catchment behaviour
- Flooding
- Stormwater detention
- Water quality
- Rainwater reuse
- Overland flow
- Emergency overflow
- Downstream impacts
- Council and statutory requirements
This integrated approach allows us to develop solutions that are both technically effective and practical to implement.
Start with a clear understanding of your site.
Whether you are assessing a site, preparing a development application or resolving a stormwater or flood constraint, ING can help define the engineering path forward.
Discuss Your Project